Assisted a Romanian power plant with a project aimed at the retrofit and switch from fossil coal to biomass firing of a CHP, namely two of the four blocks of the power station were reshaped to biomass firing with an increase in power capacity of 50 MW

Assisted a Romanian power plant with a project aimed at the retrofit and switch from fossil coal to biomass firing of a CHP, namely two of the four blocks of the power station were reshaped to biomass firing with an increase in power capacity of 50 MW